{
  "question": "q48",
  "model_1": "Qwen3.5-27B-UD-Q6_K_XL",
  "model_2": "Qwen3.8-27B-UD-Q6_K_XL",
  "answer_a_was": "Qwen3.5-27B-UD-Q6_K_XL",
  "answer_b_was": "Qwen3.8-27B-UD-Q6_K_XL",
  "verdict_code": "TIE",
  "winner": "TIE",
  "judge_model": "openai/gpt-5.6-sol",
  "server_model": "openai/gpt-5.6-sol",
  "provider": "OpenAI",
  "finish_reason": "stop",
  "usage": {
    "prompt_tokens": 10492,
    "completion_tokens": 1872,
    "total_tokens": 12364,
    "cost": 0.12173125,
    "is_byok": false,
    "prompt_tokens_details": {
      "cached_tokens": 0,
      "cache_write_tokens": 10489,
      "audio_tokens": 0,
      "video_tokens": 0
    },
    "cost_details": {
      "upstream_inference_cost": 0.12173125,
      "upstream_inference_prompt_cost": 0.06557125,
      "upstream_inference_completions_cost": 0.05616
    },
    "completion_tokens_details": {
      "reasoning_tokens": 1552,
      "image_tokens": 0,
      "audio_tokens": 0
    }
  },
  "eval_prompt_sha256": "7e58b951cb86e4deba3b60fd01e9b9bd247ebe9883e1c9e43b24acffb1fd4667",
  "report": "TIE, FUNCTIONALLY EQUIVALENT.\n\nBasis. After ordinary verification, both readers timely notify the seller, honor the full five-business-day cure period, reject the unsupported $300,000 holdback, and close only with clean title policies and lender funding. Both ultimately preserve the same options to close after cure, grant a written extension, or terminate and recover the deposit after the cure period expires.\n\n[A] rejected: following Thursday is the extended closing date because “Monday through Thursday counts as five business days” — internally inconsistent because that span contains four business days.\n[A] rejected: North Quay “MUST TERMINATE” if no payoff is produced by mid-cure period — record contradicts this by allowing cure through the extended date.\n[B] rejected: a current payoff must include every listed reconciliation and procedural detail — record requires a current written payoff but does not mandate every listed component.\n\nFailed candidates. Cure-period date — element 7 failed because ordinary date verification corrects the counting error without reconstructing legal analysis.\nFailed candidates. Premature mid-period termination — element 7 failed because the governing rule expressly preserves the entire cure period.\nFailed candidates. Answer B’s additional payoff-detail requirements — element 2 failed because both answers condition closing on insurer acceptance of a current written payoff and clean policies.\nFailed candidates. Different thresholds for a discretionary further extension — element 3 failed because the record does not establish that either threshold produces a worse outcome given the convention schedule.\n\nHard stop. The sentence cannot be completed with a concrete, record-supported consequence after ordinary verification.",
  "judge_reasoning": "",
  "_public_record": {
    "type": "published record",
    "policy": "../../PUBLIC_RECORD_POLICY.md",
    "transformations": [
      "non-substantive machine metadata normalized",
      "published-record annotation added"
    ]
  }
}
